Applications Outage

Several applications, including GIS, are currently unavailable due to an outage. We understand the importance of these services and are actively working to restore access as quickly as possible.

Application Fee Schedule - Wastewater Construction Permits

Regulation 61-30, Environmental Protection Fees, requires that applications for wastewater construction permits include a fee based on the type of project. A check for the applicable amount must be included with the application package. The fee schedule in the regulation is summarized below:

Collection systems (including interceptors and pump stations)

Delegated Review (domestic collection systems and industrial collection/pretreatment systems)

All Delegated Reviews

$75

 

Non-delegated review (based on sewer length)

1,000 feet or less

$100

1,001 feet through 9,999

$200

10,000 feet or more [or pump station(s) included]

$350

(Note: Fee exempted for individual residential pump stations)

 

Treatment systems

Facilities > 1.0 MGD

New

$1,050

Expansion

$800

Modification (no expansion)

$550

 

Facilities < 1.0 MGD

New

$700

Expansion

$550

Modification (no expansion)

$400

 

Pretreatment systems

Simple systems, such as one-component systems (e.g., oil/water separators, air strippers, pH controls, etc.)

$200

Complex systems (such as Multi-Component systems)

$600

 

Tags
Environment